We were given a week and asked to create this giant speaker stack backdrop for an Ed Sheeran and Rudimental X-Factor performance. We built and painted all of the required cabinets in three days, and transported them to Fountain studios in London for the show. The speaker stacks were then assembled in sections outside and wheeled on-stage, with the upper sections hoisted up and the lower sections wheeled in beneath. Confetti cannons were also fitted for use during the performance. As soon as the recording finished, the set was broken down and removed off-stage in eight minutes. You can watch the performance here: https://youtu.be/E9MWMKvPgQA